Vocabulary ›
Section B · The Methodology: OMG Protocol §4.6
OMG Operational Cadence
Each OMG pillar runs on its own cadence, dictated by the time horizon of the work and the ownership of the relevant team. The three rhythms are coordinated through a Quarterly Review.
- Optimize sprint. One to two weeks. Short, scoped, deterministic. A vector of technical fixes can be planned, executed, and measured within two weeks.
- Manifest cycle. Four to six weeks. Editorial commitments. A content-depth program for a topic cluster takes weeks to produce and weeks more to be ingested by AI systems.
- Generative campaign. Two to four quarters. Long-form authority-building. Establishing Wikidata presence, building citation patterns into authoritative reference domains, and earning third-party validation are quarter-to-year commitments.
- Quarterly Review. The cross-cadence coordination point. Examines pillar trajectory, AS-to-VS verification, and the intervention pipeline. The artifact most often shared with leadership.